The objective is: 
3062.02
The running time is: 
200.843
The time meeting best is: 
186.964
Location: 1(load: 4540) 
 Route 0(load: 2280) 14 12 11 18 17 20 19 13 
 Route 1(load: 2260) 4 5 16 15 23 21 22 24 3 
Location: 2(load: 3870) 
 Route 0(load: 1570) 2 7 6 1 
 Route 1(load: 2300) 0 26 25 10 8 9 
The actual cost is 3062.02
